Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/pmdfidpe/lgpunjab.org.pk/wp-includes/functions.php on line 6121
Guideline for Installation of Water Connection - Burewala

Guideline for Installation of Water Connection

Guideline for Installation of Water Connection

It is necessary that the water supply pipeline should pass near the house of the applicant.

The procedure for getting a new water connection

  • 1- Application form to be obtained from TO (I&S) office
  • 2- Water Supply Incharge reports – field condition
  • 3- Sub-Engineer verification
  • 4- Allowed by a competent authority in Municipal Committee
  • 5- Fee charges deposited

Documents Required for application

  • 1- Ownership papers of the property
  • 2- Copy of NIC

Types of Connections

The following types of connections are sanctioned:
  1. 1- Domestic (Metered)
  2. 2- Commercial (Metered)
  3. 3- Industrial (Metered)
  4. 4- Charitable